Periodic work (PE) refers to cyclical services performed in a building, such as cleaning, gardening, pest control, and security patrols. Preventive maintenance (PM), on the other hand, is basic, periodic maintenance such as air conditioning cleaning or machinery checks. These are scheduled as individual tasks. When PE/PM plans are created in eS/FAC Serve, building managers and owners can instantly see if each cycle is being completed as scheduled and if each contractor is fulfilling their service requirements, eliminating the need to rely on paper reports.
The PE/PM scheduling function in the eS/FAC Serve building services management system is a crucial tool for systematically managing building services. It supports all aspects of service operations, such as cleaning, routine maintenance, gardening, pest control, security, and safety. Through proactive planning and optimal resource allocation, this function helps create high-quality service standards and effectively meets customer expectations through facility management and the facility management system.
This function allows managers to define project plans up to a year in advance, covering details such as areas to be serviced, operational methods, required products, and expected completion times through the building management system.
For cleaning large areas such as commercial buildings or shopping malls, this advance planning allows for more efficient management of resources such as personnel and equipment. It can also be applied to basic maintenance tasks such as air conditioning cleaning or routine machinery checks, in a task-by-item planning format. For maintenance tied to individual assets, see the PPM feature for more information.
The PE/PM schedule management function displays the planned tasks in an easily accessible calendar format in eS/FAC Serve. Each day shows the schedule managed, with planned tasks displayed on their designated dates. Tasks can be viewed in advance. This PE/PM schedule management function not only reduces the risk of task omissions but also allows the team to prepare in advance through the building services management system.
For example, in the field of safety, periodic inspections of safety equipment are crucial. A PE/PM (Preventive Safety Equipment/Problem Prevention) plan helps ensure that no steps are overlooked.
This function helps to clearly define the details of each task, such as:
Areas to be serviced: Specify the area that needs attention, such as hallways, restrooms, or outdoor gardens.
Operational Procedures: Specify specific steps, such as floor cleaning with specialized equipment, pest control, or routine air conditioner cleaning.
Products and Equipment: Specify the type of products needed, such as cleaning solutions, lawn mowers, or safety equipment.
Estimated completion time: Helps allocate time appropriately based on the scope of the work.
Specifying these details helps the team have clear information, reduces errors, and increases confidence in the work process at every stage of the project.
The PE/PM project management function allows managers to track all tasks through real-time reports. This information can be presented in a calendar or detailed list format, enabling managers to use the PE/PM service plan to:
Monitor performance: Check whether the task is completed on time.
Analyze trends: Identify areas or problems that require further improvement.
Improve management: Use historical data to plan for the future effectively.
For example, in security work, reports on periodic patrols can show information about high-risk areas that need increased attention, or in gardening, tree trimming reports can help with better resource planning.
Employees can update their job status instantly through the system from their workplace, such as:
Confirmation of completion: Mark the task as complete.
Observation Notes: Add notes about problems encountered during the task, such as broken equipment or product shortages.
This real-time update allows management to monitor job status at all times and ensures the company is fully compliant with service requirements.
Using the PE/PM project management function helps companies manage their operations more efficiently, reduces the risk of overlooking important tasks, and increases customer satisfaction. Better management reduces unnecessary expenses and strengthens long-term customer relationships through facility management software.